What Is AS/NZS 5601?

AS/NZS 5601 covers the design, installation, commissioning, and maintenance of gas installations. It applies to natural gas (NG) and liquefied petroleum gas (LPG) systems in residential, commercial, and industrial settings. For QLD gas fitters, compliance is mandatory under the Petroleum and Gas (Production and Safety) Act 2004.

The Two Parts

PartTitleScope
Part 1General InstallationsPipe sizing, materials, installation methods, testing, commissioning, ventilation, clearances, appliance connections
Part 2LP Gas Installations in Caravans and BoatsSpecific requirements for mobile/marine LP gas systems (less common for residential plumbers)

Critical Clauses for Residential Gas Work

Gas Meter Clearances (Clause 5.3)

FromMinimum Clearance
Openable windows/doors500mm
Sources of ignition1000mm
Electrical switchboards/meters500mm (or separated by non-combustible barrier)
Ground levelMinimum 150mm above finished ground

Gas Pipe in Wall Cavities (Clause 5.5.3)

Gas piping installed in wall cavities must be:

Testing Pressures (Clause 7.2)

Test TypePressureDurationAcceptable Result
Strength test (new install)10 kPa (NG) / 20 kPa (LPG)3 minutes minimumNo pressure drop
Tightness testOperating pressure (2.75 kPa NG)3 minutes minimumNo pressure drop
PurgingOperating pressureUntil gas detected at outletConfirm gas presence, check for leaks

Ventilation for Gas Appliances (Clause 6.4)

All gas appliances require adequate ventilation for combustion air and flue gas dispersal:

LPG Cylinder Location (Clause 5.11)

When Do You Need to Lodge a Form?

In QLD, most gas work is notifiable work requiring a Form 7 lodgement with your local council within 5 business days of completion. This includes new gas installations, alterations to existing gas systems, and gas appliance connections (except like-for-like replacements in the same location).