What is a Form 4 Notifiable Work in QLD?

Summary (TL;DR)

A Form 4 is used in Queensland to register "Notifiable Work" with the QBCC. This covers routine plumbing jobs that don't require local council approval or inspection (like replacing a hot water system, renovating an existing bathroom, or extending a water pipe). It must be lodged online via myQBCC within 20 business days of completing the work.

Understanding Form 4 (Notifiable Work)

In Queensland, plumbing work is divided into three categories: Regulated Work (requires council approval and a Form 7), Notifiable Work (requires QBCC notification via Form 4), and Minor Work (no notification required).

When Do You Need a Form 4?

Notifiable work generally includes routine additions and replacements to existing buildings. Common examples include:

When is a Form 4 NOT Enough?

If you are installing drainage for a brand new building, connecting a property to the council sewer main for the first time, or installing an on-site septic system, this is Regulated Work. You must lodge a Form 7 with the local council, not a Form 4 with the QBCC.

Lodgement Rules

The Form 4 must be lodged online through the myQBCC portal within 20 business days of completing the work. You must also give a copy of the completed Form 4 to the property owner or occupier.

Manage Your Compliance in One Place

Juggling Form 4s, Form 7s, and Form 9s is an administrative nightmare. TradeDesk.now centralises all your compliance documents. Generate, track, and lodge forms from your phone, and never miss a deadline again.