When Do You Need a Form 7 in QLD? Complete 2026 Guide for Plumbers

The Rule: In QLD, all notifiable plumbing and drainage work requires a Form 7 (Notifiable Work Notice) lodged with your local council within 5 business days of completion. Failure to lodge can result in QBCC disciplinary action and fines up to $13,345 per offence.

What Is a Form 7?

Form 7 is the official "Compliance Notice for Notifiable Work" under the Plumbing and Drainage Act 2018 (QLD). When you complete notifiable plumbing or drainage work, you must certify that the work complies with the relevant standards (AS/NZS 3500, AS/NZS 5601) and lodge the form with the local council responsible for the property's location.

What Work Requires a Form 7?

Work TypeForm 7 Required?Examples
New installationYESNew bathroom, new sewer connection, new gas line, new hot water system
Alteration to existingYESMoving a toilet, extending drainage, adding a fixture, relocating gas point
DisconnectionYESCapping a sewer, removing a gas line, disconnecting water supply permanently
Like-for-like replacement (same location)NO*Replacing a hot water system in the same spot, replacing a tap
Maintenance/repairNOClearing a blocked drain, fixing a leaking tap, replacing a washer
Gas appliance connection (new location)YESInstalling a gas cooktop where there wasn't one before
Gas appliance replacement (same location)NO*Swapping a gas cooktop for a new gas cooktop in the same spot

*Note: "Like-for-like" is narrowly defined. If the replacement requires ANY modification to pipework, drainage, or connections, it becomes an alteration and requires Form 7.

The Grey Areas That Trip Plumbers Up

Hot Water System Replacement

Same location, same type: No Form 7 (e.g., replacing a gas storage HWS with another gas storage HWS in the same spot).

Different location OR different type: Form 7 required (e.g., moving HWS from ground to roof, or switching from gas to heat pump — new pipework = alteration).

Adding a Dishwasher

If there's an existing dishwasher connection point — no Form 7. If you're creating a new connection to the water supply and drainage — Form 7 required (new installation).

Replacing a Toilet

Same location, connecting to existing drainage — no Form 7. Moving the toilet to a different position — Form 7 required (alteration to drainage).

How to Lodge a Form 7

  1. Complete the work
  2. Fill out Form 7 with: your QBCC licence details, property address, description of work, applicable standards, compliance declaration
  3. Sign the form (you're certifying compliance)
  4. Lodge with the local council within 5 business days
  5. Pay the lodgement fee (varies by council — typically $30-120)

Lodge Form 7 in 30 Seconds with TradeDesk

TradeDesk auto-fills Form 7 from your job details — property address, work description, your licence number, and compliance declaration. Sign on screen, tap lodge, and it's emailed directly to the correct council. No PDFs, no printing, no scanning.

Start your free trial — Form 7 lodgement is included in Pro, and there's also a Forms Only plan from $59/year if digital lodgements are all you need.